Eglinton LRT – Cedarvale Station SEM and SOE

Eglinton LRT – Cedarvale Station SEM and SOE

The Eglinton LRT Cedarvale Station required the new structure to pass below the existing TTC subway below grade. HC Matcon Inc. (HCM) was contracted by the Crosslinx group to perform segmental excavation method (SEM) and support of excavation (SOE) below the existing subway tunnel. HCM performed the detailed excavation and the installation of dry mix shotcrete in 6 galleries for the phased installation of structural needle beams to support the tunnel above.
HCM’s SEM work involved excavation in 1.1m sections, installation and stressing of temporary supports, and installation of accelerated fibre-reinforced dry mix shotcrete for the walls and base slab. Due to strict movement tolerances of the tunnel above, a unique prestressed waler incorporated with shotcrete shoring was implemented. Special design and constructability considerations were coordinated with the designer to ensure safety during excavation. HCM installed a waler and tie-rod system that was prestressed from between the walers to achieve the deformed shape required by designers.
Due to HCM’s knowledge and experience with shotcrete and associated applications,
this unique project was executed successfully and to the satisfaction of the project
team.

Location: Toronto, ON 

Customer: SKYGRiD Construction Inc.

Segmental Excavation Mining and Support of Excavation - Eglinton LRT - Cedarvale Station SEM and SOE
Segmental Excavation Mining and Support of Excavation - Eglinton LRT - Cedarvale Station SEM and SOE
Segmental Excavation Mining and Support of Excavation - Eglinton LRT - Cedarvale Station SEM and SOE
Weston Tunnel Grade Separation

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation HC Matcon achieved a significant milestone on the Weston Tunnel project, allowing for the GC to accelerate the schedule and make up for project delays. HCM
Read More

Highland Creek WWTP

Highland Creek WWTP Due to increased population and the requirement for treating excess amounts of waste water, Highland Creek WWTP underwent a significant upgrade to provide clean water for the
Read More

Currie Barracks Residential Development

Currie Barracks Residential Development HCM was contracted to provide the design and installation of shoring system for a multi-family condo development in the Currie Barracks area SW Calgary. Conventional cantilever
Read More

8 Ida Street

8 Ida Street HC Matcon was retained to install panel underpinning for a custom home built by Laureden Inc. in 2007 in one of Markham’s prestigious neighbourhoods.  Due to lack
Read More

Weston Road

Weston Road The Metrolinx Weston Tunnel project will serve as a below grade rail corridor for the GO Georgetown line linking the airport to downtown Toronto. HCM was subcontracted by
Read More
St. Joseph's Health Centre Parking

St. Joseph’s Health Centre Parking

Shotcrete Reduces Costs for Owner The St. Joseph’s Health Centre is adding a new Our Lady of Mercy wing complete with three levels of underground parking. HC Matcon was responsible
Read More