Skip to content

Mill Pond Estates

Shotcrete: Low Cost and Overcoming Hillside Access Issues

This 12,000 sq. ft. project involved temporary hillside shoring for a developer in Tillsonburg.

  • The project was completed during winter months with winter protection of panels and concrete and special measures by HC Matcon designed for winter conditions.
  • The shotcrete shoring solution was both low cost and viable due to the hillside access issues. The final building is designed to take the hillside load through concrete shear walls and footings.
  • Soil nail walls do not involve stressing the anchors, while HC Matcon practices the Vancouver method of Shotcrete shoring which used strict panel sequences with post tensioning of anchors to reduce movement.
  • Total station monitoring can track vertical and horizontal movement of the typical Shotcrete shoring wall by fixing targets to the shoring wall as it is constructed. Work proceeds in 5-6 Ft. vertical lifts, so a project schedule is typically the height of cut, divided by 5 in weeks.

Client: Mill Pond Estates
Location: Tillsonburg, Ontario

University of Ottawa STEM Complex

University of Ottawa STEM Complex HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh
Read More
Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2 HC Matcon’s project at the Siemens Energy Blade Plant consisted of the design, supply & installation of 70 helical piers within the existing
Read More
Love Condos

Love Condos

Love Condos This project involved approx 41,000 sf of piles and lagging temporary shoring system. The project was broken into two phase both consisting of piles and lagging with both
Read More

Dufferin Jog Elimination

Dufferin Jog Elimination This project involved the extension of Duffering Street under an existing CN rail line and through the abutment wall of a century old CN bridge at Queen
Read More
Dufferin Mall

Dufferin Mall

Dufferin Mall Pedestrian Tunnel This renovation project includes the challenge of constructing a 10ft wide by 12ft deep pedestrian tunnel inside an active mall. HCM together with RWH Engineering proposed
Read More
HCM Group - K2 Condominiums

K2 Condominiums

K2 Condominiums This development on King Street in Waterloo required approximately 15,000 SF of shoring for two levels of underground parking. RWH Engineering Inc. (RWH) designed a piles and lagging
Read More