Mill Pond Estates

Shotcrete: Low Cost and Overcoming Hillside Access Issues

This 12,000 sq. ft. project involved temporary hillside shoring for a developer in Tillsonburg.

  • The project was completed during winter months with winter protection of panels and concrete and special measures by HC Matcon designed for winter conditions.
  • The shotcrete shoring solution was both low cost and viable due to the hillside access issues. The final building is designed to take the hillside load through concrete shear walls and footings.
  • Soil nail walls do not involve stressing the anchors, while HC Matcon practices the Vancouver method of Shotcrete shoring which used strict panel sequences with post tensioning of anchors to reduce movement.
  • Total station monitoring can track vertical and horizontal movement of the typical Shotcrete shoring wall by fixing targets to the shoring wall as it is constructed. Work proceeds in 5-6 Ft. vertical lifts, so a project schedule is typically the height of cut, divided by 5 in weeks.

Client: Mill Pond Estates
Location: Tillsonburg, Ontario

Mars B Toronto General Hospital

Mars B Toronto General Hospital

This 3.5 Million dollar contract involved HC Matcon providing a full excavation, a 16,000 Sq. Ft. shoring and large diameter caisson package for this project. Challenges included the support of
Read More

Sarcee Trail

Sarcee Trail The foundation of an existing residential apartment building in Southwest Calgary was compromised and required remedial measures to be completed. RWH designed a micropile underpinning system based on
Read More

Odeon Ronmore Development

Odeon Ronmore Development HCM was contracted to provide the design and installation of shoring system for a mixed use commercial development in the main corridor of the Garrison Woods area
Read More

Talbot Street

Talbot Street HCM completed the design-build shoring for the Azure condominium project in downtown London. Due to the soil conditions encountered during initial drilling, a full depth caisson wall was
Read More

Alloa Feedermain

Alloa Feedermain This project involved installation of 3 watertight caisson wall shafts. Two rectangular secant pile wall shaft approx 12m deep and one 6m diameter compression ring shaft approx 7m
Read More

Twinning Tunnels

Twinning Tunnels The installation of a deep trunk sanitary sewer system in the bedrock beneath Erin Mills Parkway in Mississauga required an innovative approach for shoring manholes. For this project,
Read More