Mill Pond Estates

Shotcrete: Low Cost and Overcoming Hillside Access Issues

This 12,000 sq. ft. project involved temporary hillside shoring for a developer in Tillsonburg.

  • The project was completed during winter months with winter protection of panels and concrete and special measures by HC Matcon designed for winter conditions.
  • The shotcrete shoring solution was both low cost and viable due to the hillside access issues. The final building is designed to take the hillside load through concrete shear walls and footings.
  • Soil nail walls do not involve stressing the anchors, while HC Matcon practices the Vancouver method of Shotcrete shoring which used strict panel sequences with post tensioning of anchors to reduce movement.
  • Total station monitoring can track vertical and horizontal movement of the typical Shotcrete shoring wall by fixing targets to the shoring wall as it is constructed. Work proceeds in 5-6 Ft. vertical lifts, so a project schedule is typically the height of cut, divided by 5 in weeks.

Client: Mill Pond Estates
Location: Tillsonburg, Ontario

Paruk Residence

Paruk Residence

Overcoming Poor Soil-Bearing Capacity The Paruk Residence is a high end two story structure, located at 24 York Valley Crescent in North York, Ontario, just north of the Don River.
Read More

Silver Creek Solar Farm

Silver Creek Solar Farm For this project, HCM provided installation services to EllisDon for the helical pile foundations for future solar racking. Due to the stringent timelines and project milestones,
Read More

George Street Bridge

George Street Bridge This bridge replacement project required the drilling of two abutments consisting of a total of 32 drilled caissons in the existing creek bed. In addition to the
Read More
LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall HC Matcon (HCM) and RWH Engineering (RWH) reacted quickly after being contacted to provide a design-build solution for a slope failure that occurred during
Read More
Aldershot GO Station Improvements

Aldershot GO Station Improvements

Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The
Read More
Currie Reservoir - Continuous Caisson Wall

Currie Reservoir – Continuous Caisson Wall

Increased Safety: We Used Horizontal H-Piles This project is a part of a large upgrade to the Currie Reservoir in southwest Calgary, Alberta. The project included the installation of a
Read More