Currie Barracks Residential Development

Currie Barracks Residential Development

HCM was contracted to provide the design and installation of shoring system for a multi-family condo development in the Currie Barracks area SW Calgary. Conventional cantilever pile and timber lagging shoring system was used to support the excavation for the foundation wall along 50% of the perimeter of the entire building footprint. Most of the shoring was offset from the foundation wall and the remaining portion was used as a blind form for the concrete formworks. This was determined by the presence of the City of Calgary Utility Right of Way (URW) and the close proximity to the property line at the areas that required shoring. The depth of excavation varied from 4-5 metres below grade. The shoring was regularly monitored by an HCM field engineer in order to detect any unusual movement and/or anomalies which may occur in early stages of the excavation. If movement had occurred, an alternate design solution consisting of an internal raker bracing was prepared at early stages of the shoring design. This provided the owner/developer with significant cost savings as the shoring showed negligible movement for the duration of the excavation.


HCM completed this project on schedule and according to the planned stages of the progress requirements determined by the General Contractor.

Location: Calgary, Alberta

Customer: Lear Construction Management

EEEL University of Calgary

EEEL University of Calgary

Zero Ground Loss This project followed shortly after finishing the Taylor Family Digital Library project, which was in close proximity to this site on the same campus. Design considerations for
Read More
Credit Valley Hospital

Credit Valley Hospital

Alternative to Save Time and Money The Credit Valley Hospital in Mississauga, Ontario is undergoing a massive expansion and renovation. HC Matcon was brought in to undertake the shoring, underpinning,
Read More
St. Joseph's Healthcare Redevelopment Project

St. Joseph’s Healthcare Redevelopment Project

Unique Soil Conditions The future location for this tower is located immediately adjacent to the emergency wing of the existing St. Joseph’s hospital in Hamilton, Ontario. HCM is a recognized
Read More
TTC St. Clair Station

TTC St. Clair Station

Overcoming Tight Access and High Water Table Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During
Read More

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More
HCM Group - K2 Condominiums

K2 Condominiums

K2 Condominiums This development on King Street in Waterloo required approximately 15,000 SF of shoring for two levels of underground parking. RWH Engineering Inc. (RWH) designed a piles and lagging