Currie Barracks Residential Development

Currie Barracks Residential Development

HCM was contracted to provide the design and installation of shoring system for a multi-family condo development in the Currie Barracks area SW Calgary. Conventional cantilever pile and timber lagging shoring system was used to support the excavation for the foundation wall along 50% of the perimeter of the entire building footprint. Most of the shoring was offset from the foundation wall and the remaining portion was used as a blind form for the concrete formworks. This was determined by the presence of the City of Calgary Utility Right of Way (URW) and the close proximity to the property line at the areas that required shoring. The depth of excavation varied from 4-5 metres below grade. The shoring was regularly monitored by an HCM field engineer in order to detect any unusual movement and/or anomalies which may occur in early stages of the excavation. If movement had occurred, an alternate design solution consisting of an internal raker bracing was prepared at early stages of the shoring design. This provided the owner/developer with significant cost savings as the shoring showed negligible movement for the duration of the excavation.


HCM completed this project on schedule and according to the planned stages of the progress requirements determined by the General Contractor.

Location: Calgary, Alberta

Customer: Lear Construction Management

TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting
Read More
The Fuse at Evolution

The Fuse at Evolution

The Fuse at Evolution Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal
Read More
Currie Reservoir - Continuous Caisson Wall

Currie Reservoir – Continuous Caisson Wall

Increased Safety: We Used Horizontal H-Piles This project is a part of a large upgrade to the Currie Reservoir in southwest Calgary, Alberta. The project included the installation of a
Read More

Mapleview Drive

Mapleview Drive The expansion of Mapleview Drive in Barrie required track protection for an existing railway overpass. HCM was retained to install a strutted piles and lagging shoring system. RWH
Read More

Cobourg Railway Station

Cobourg Railway Station On this project, HCM, in conjunction with its in-house engineering company, RWH Engineering Inc. (RWH), was able to offer the owner one source for the design, supply,
Read More
HC Matcon - Twinning of the West Trunk Sanitary Sewer

Twinning of the West Trunk Sanitary Sewer

Twinning Of The West Trunk Sanitary Sewer This project includes the installation of a deep trunk sanitary sewer within bedrock under Erin Mills Parkway in Mississauga. HCM together with RWH Engineering
Read More