Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting challenges, including extremely tight access and a high water table. The east elevator pit was constructed with a 10 m deep caisson wall, braced horizontally
Kidd’s Creek Culvert Restoration
Versatile Installations Minimized Costs Work on the Kidd's Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts and storm and sewer pipe in downtown Barrie, Ontario. Helical pile support systems were ideal for use on the project based on the type of
TTC St. Clair Station
Overcoming Tight Access and High Water Table Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted with some interesting challenges, including extremely tight access and a high water table. The east elevator pit was constructed with
Niagara Biosolids Facility – Inside Pit
A Shotcrete Solution to a Difficult Problem Work to the existing Biosolids Facility required the installation of deep pits and foundations for proposed processing equipment. Due to the tight confines of the site and the proximity of exterior walls, columns and footings, the use of a traditional soldier pile and lagging system was not feasible.
Aldershot GO Station Improvements
Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The project was further complicated by the proximity of high speed passenger train rails and the need to maintain and operate the facility while the work