St. Catharine’s Exit Shaft

St. Catharine’s Exit Shaft

This project consisted of an exit shaft that was completed in one day and consisted of an innovative drilled shaft option completed at a fraction of the cost of the entry shaft constructed which took several weeks. The top 12-15′ of soil was a soft clay requiring a top liner for soil retention. HCM provided Baiocco